soxteacher

Chemistry, Technology, Baseball, Swimming

Robotics – Lego Project 2

Building

Goal

  • The goal of the project is to build a robot that can successfully explore a room without stopping.

Guidelines

  • Each student should start with the basic robot building instructions [LINK].
  • After building the robot, the student should download the provided program and install this on the robot.
  • The student should test the robot’s performance, modifying as needed to make sure that it can successfully navigate any room.
  • Students are encouraged to add extra “bells and whistles” such as sounds, lights, rotations (etc) to personalize the robot behavior.

Evaluation

  • The students will present their robots to a gathering of the RSCJ at the Oakwood facility. Each student will stand up and introduce him/herself as well as his/her robot.
  • Each student will discuss a unique building and programming element that they have included.
  • The robots will them be placed on the floor as a demonstration.

Information

This entry was posted on October 4, 2012 by in Projects, Robotics and tagged , , .

Instagram

Hail the new champion! Quintonia fantasy baseball has a new master! @jodyquinton Game 2 #NLCS @cubs @dodgers Reminiscing about #SoCal and #BMHS Afterglow from #nlcs win for @dodgers #FLYTHEL @cubs Let’s get this started! @cubs @dodgers #nlcs Hey there Los Angeles! #southbay #redondobeach

Categories

%d bloggers like this: